Client | M/s J.C GROUP |
Engineer | M/s ARSINALS ENGINEERING |
Main Contractor | AL JAMEEL CONSTRUCTION W.L.L |
Contract Start Date | September 2019 |
Project Period | 24 Months |
Location | Juffair, Kingdom of Bahrain |
Contract Cost | BHD 4,470,279.000 |
Al Jameel Construction W.L.L.
P. O. Box 75637, Villa 13, Block 360,
Zinj, Kingdom of Bahrain
Email: [email protected]
Phone: (973)17213003
Fax: (973) 17210103
[contact-form-7 id="307" title="Project Enquiry"]